Wind turbine parts by train

train20100922_4538
A train loaded wind turbine parts in California and brought them to Superior and then over the Grassy Point Bridge to Duluth and to Lake Superior Warehousing. There the pieces were taken off the rail cars in the same place they take them off the ships. They were then taken by truck to another part of the Warehouse and put in lay-by until they will be picked up and loaded onto trucks for the trip to the final destination in Manitoba. The picture shows 2 views of the train approaching the 27th Ave bridge over I-35. They had crossed over the Grassy Point Bridge about 45 minutes earlier.