Peter Rönna here with wind turbine parts

20140714893
The Peter Rönna arrived this morning (above) on her first visit to the Twin Ports. She brought the 15th shipment of wind turbine parts to come here by ship for Minnesota Power. They loaded the cargo in Brande, Denmark, where the equipment is manufactured by Siemens. After the equipment is discharged here, trucks will take the over 2 dozen pieces to the Bison Wind Energy Center near New Salem, N.D. As she moved up the Duluth harbor, she was greeted by the departing Roger Blough, going to Two Harbors to load iron ore pellets after some repairs were made at Fraser Shipyards.
20140714917