News notes for January, 2011 …

… as of Wednesday, January 17, 2011
Winter layup in Duluth
The Adam E. Cornelius, American Victory and Edward L. Ryerson have been in port for an extended layup. The H. Lee White arrived in port for winter layup on January 4th, 2011. The American Spirit arrived here for layup on January 12, 2011 and the Roger Blough arrived on January 14th. Both the American Century and the James R. Barker came in on the morning of January 17, 2010; the American Integrity arrived on January 18th. The John G. Munson arrived on Wednesday morning  January 19, and is the last arrival for layup for the winter. Weather will not allow the American Mariner to be as originally expected. You can check the schedule page at www.duluthboats.com for up-to-date information.
Soo Locks According to the Cheboygan Daily Tribune, the U.S. Army Corps of Engineers has granted a request from the Lake Carriers’ Association to extend the closing date of the Soo Locks for three days. The Poe Lock will officially close for the season on Tuesday, January 18th so that low inventories of iron ore pellets could be replenished to meet the wintertime needs of industry. The locks traditionally close on January 15th each year.
bridgepainting20100224_1581Bridge painting The Duluth Aerial Lift Bridge will close at 6 am on Friday, January 14 so that the south tower can be painted (the North tower was painted last winter. See picture at left). That means all traffic after the 14th and until the end of the season (defined as the time that the last boat arrives in port) will use the Superior entry to access the port. It is anticipated that the bridge will reopen for traffic at 10am on March 14th. Watch paint dry!! You can still watch the paint dry, or at least watch the tent that covers the bridge paint while it dries, at our live 24/7 web cam at www.duluthshippingnews.com/dsntv I may find something even more interesting that paint drying before the winter is over!