Making up for lost time

Above, the Iryda came into port this morning (May 22, 2014) to load grain at CHS. Above, the BBC Celina arrived under the Duluth Aerial Lift Bridge on May 21st to load grain at the CHS 1 grain elevator in Superior. The Apollon can be seen at anchor waiting to come in to load at the same terminal. Below, assisted by 2 Great Lakes Towing tugs, … [Read more...]