Americaborg brings wind turbine parts

americaborg20120518_2288
The Americaborg came into port on May 15, 2012 with wind turbine pieces built in Denmark by Siemens Wind Power. Above, a nacelle has just been discharged from her cargo hold and deposited on ‘Big Red’ for the short trip to the other end of the Port Terminal. After all wind turbine pieces had been discharged, she moved over to the CHS 1 terminal in Superior to load grain. She may leave on Sunday although weather may delay her departure.