Next stop: Brazil

The Alamosborg departed Duluth late Friday afternoon, June 29, 2012 … [Read more...]

Blades to Brazil

The Alamosborg is now (June 28, 2012) at the Port Terminal loading 60 wind turbine blades. She was here a week ago to discharge wind turbine parts she brought into port. After that, she left the Port Terminal dock to go to the anchorage and wait for the Flinterstar to complete discharging her cargo of wind turbine blades. She then came back in to load 60 wind turbine blades … [Read more...]

Active at the Port Terminal

On Friday, June 22, 2012, the HHL Amazon (left) was discharging wind turbine nacelles and the Edgar B. Speer was in for some repairs. Over by the gantry cranes (unseen at right), the Alamosborg was discharging wind turbine parts. Work at the Port Terminal was halted for one day by the flood; 3 feet of water over much of the warehouse made sure of that. Elsewhere in the port. … [Read more...]

Alamosborg waits for the rains to stop

Rains came to Duluth; the ships are still on the water but the workers stayed  home, as the Mayor asked. The Alamosborg is at the Port Terminal, waiting for better weather tomorrow, and some folks back to help her discharge her wind turbine pieces. … [Read more...]