Edgar B. Speer

Edgar B. Speer was built in 1980, is 1004 feet long, and flies a U.S. flag

Click here for other pages featuring the Edgar B. Speer
The Edgar B. Speer was built in two sections in 1980, one in Toledo and one in Lorain. She was launched on May 8, 1980. Her 20 hatches feed 5 holds where she can load 73,700 tons of cargo. Her unusual self-unloading system consists of a stern mounted 52-foot unloading boom that restricts her cargo to taconite pellets. The only two locations that can accept the Speer’s unloading boom are located in Gary and Conneaut. Picture above taken Sunday, April 5, 2009.
2016
The Speer comes under the Duluth Aerial Lift Bridge on October 10, 2016
2014
Above, the Speer in the Duluth harbor on August 14, 2014

2011
She makes the turn to the St. Louis River on May 23, 2011.
2009
On March 16, 2009, the Speer was still at her winter layup berth at St. Lawrence Cement, waiting for the new season to begin. She came in on January 16, 2009; she departed with iron ore pellets loaded at the CN dock on April 5th. The two below: she was back here to load more iron ore pellets, this time for Gary, Indiana.
On June 21, 2009, Captain Daniel Rentschler and 3rd mate Thomas Lanthier were greeted by their families on Fathers Day, obviously happy that father would be home for the big day. I wrote an article for the Duluth News Tribune, here.
2008
It was a cold December 3rd, as the Speer was entering the Duluth harbor on her way to the CN dock to load iron ore pellets.
Picture above taken Monday, December 22, 2008 as the Speer approached the Duluth Aerial Lift Bridge
2006
Above at her winter layup berth at St. Lawrence Cement on January 25th; below, she arrives Duluth on April 18 to pick up more iron ore pellets at the CN dock.
2005
The 2 above and 2 below, she greets those of us who braved the cold to see her come in as the sun was rising behind her.
On March 31st, she came under the Duluth Aerial Lift Bridge to get fuel at the Calumet fuel dock before moving to the BN dock to load iron ore pellets.
Picture above taken on Friday, January 7, 2005 as she approached the Superior channel on her way to load iron ore pellets at the BN dock. She will follow tracks opened up the day before by the Coast Guard cutter Alder.
2004
Above and below, she departs Duluth after receiving some minor repairs. She went to Two Harbors to load iron ore pellets.
Picture above taken Monday, October 25, 2004 as she was going to the Fuel dock before moving over the BN to load iron ore pellets.
2003
Picture above taken Sunday, March 23, 2003: first commercial boat to depart Duluth in 2003 season