Callaway in before fireworks

2017-0704-3449
The Cason J. Callaway arrived Duluth shortly before the Aerial Bridge closed down for the fireworks, around 4:30 on July 4th. (The Walter J. McCarthy, Jr. followed her in about an hour later.) The Callaway brought a cargo of limestone to discharge here before leaving for Two Harbors to load iron ore pellets. This was only her 4th trip to the Twin Ports this season; she was here 19 times last season.

Leave a Comment

*