Duluth Aerial Lift Bridge lifts for 2 boats

On September 27, 2015, the Aerial Lift Bridge made a lift for 2 boats, the Tim S. Dool, arriving here with cement to discharge, and the Walter J. McCarthy, Jr., leaving with coal.

Comments

  1. Thomas Wojcik says:

    Great slideshow. I’m always somewhat disappointed to see the ships needing a coat of paint,especially in the case of the McCarthy when she was laid up for so long in warm weather. If they would have supplied the paint I think a few of us would have volunteered to do the job!!

Leave a Comment

*