Archives for June 9, 2013

Duluth on a Saturday night

andersonblockyulia20130608_9102
Saturday evening, June 8, 2013, Duluth harbor. The Arthur M. Anderson had arrived in port at 7 am that morning with limestone to discharge at the C. Reiss terminal in West Duluth. Finished with that job, she departed Duluth at 7:38 Saturday evening (below) for the Two Harbors CN dock to load iron ore pellets. Not sure why she is pointing away from the Aerial Bridge above (possibly turning around after fueling). Behind the Anderson, we see the Joseph L. Block, arriving under the Aerial Bridge at 7 pm, on her way to discharge limestone at the CN dock in West Duluth. At the right, we see the Liberian flagged  Yulia still at the Port Terminal where she has been discharging cargo for several days.
arthurmanderson20130608_9125g
In 2013, the Anderson has worked the limestone trade, loading in Port Dolomite and Calcite in Michigan and discharging that cargo at the Hallett dock and C. Reiss Dock in Duluth, at Buffington and Huron in Ohio and in Detroit. Her trips to Duluth with limestone are followed by loading iron ore pellets at the CN docks in Duluth or Two Harbors which she takes to either Gary or Conneaut. Then after a couple trips loading and discharging limestone in the lower lakes, she brings a load up here to discharge before loading iron ore pellets for her downbound trip.