Storm outside, not so bad inside

20130411_8242
Outside the harbor, with winds gusting as high as “unable to open my car door, almost,” Duluth waits for the snow to come; within the hour as this picture was taken at 10am on April 11, 2013. The Mesabi Miner came under the Duluth Aerial Lift Bridge this morning at 2:23. She arrived at the Fuel Dock as the Paul R. Tregurtha finished and departed for Midwest Energy where she is now loading coal. The Mesabi Miner will load iron ore pellets at the CN in Duluth, just across the St. Louis River from Midwest Energy. The winds, gusting at high as 47 mph, may delay arrivals and departures today.
mesabiminor20130411_8206

Comments

  1. Jean ouellette says:

    Gheeyoure doing à gréât job

Leave a Comment

*