The Aerial Lift Bridge will be closed to vessel traffic from 9 a.m. to 3 p.m. on Wednesday, October 31, 2012 to allow workers to replace an electrical switching assembly. The unit will be installed to ensure operation of a backup diesel generator in case normal power is lost. (from the City of Duluth)
Previous post: Seldom seen Algorail, seen!
Next post: Copenhagen loading grain at CHS 2