Thanks to Dennis O’Hara

Late last evening at 20:45, as the Duluth Aerial Lift Bridge was lifting for the 1000 foot American Integrity

Late last evening at 20:45, as the Duluth Aerial Lift Bridge was lifting for the 1000 foot American Integrity, the bridge lost power and the alert crew of the Integrity made a go-around and re-entered once the power was restored.
Had the crew and Bridge Operator not done a superb job in dealing with this emergency, a catastrophe would have occurred in front of a crowded Canal park.
This video will show the first attempted entry and the go-around.

Kenneth Newhams :