Herbert C. Jackson arrives with coal …

The Herbert C. Jackson is here to discharge at Hallett Dock #5. She will then move a slip down the St. Louis River to the CN Dock to load iron ore pellets.
Listen here to her whistle as she arrived today (October 26, 2011)
Kenneth Newhams :