Morning on Wednesday, May 19. Each gantry crane has a hold at each end of the bar being used to lift a nacelle from the cargo hold of the Metsaborg (inset). The cranes slowly lift the nacelle out of the hold, over the deck of the ship, on onto a waiting trailer truck.
Previous post: First wind turbine boat of the season
Next post: Spring Summer Winter??
{ 1 comment… read it below or add one }
Was a bit foggy in Duluth today and tonight (Monday, May 24th)
To bad the live feed showing the bridge doesn’t have sound.
I’ll bet the fog horn on the south pier was going !