Previous post:

Next post:

Lifting wind turbine parts from the Metsaborg

May 19, 2010 · 1 comment

metsaborgwithinset20100519_0702 
Morning on Wednesday, May 19. Each gantry crane has a hold at each end of the bar being used to lift a nacelle from the cargo hold of the Metsaborg (inset). The cranes slowly lift the nacelle out of the hold, over the deck of the ship, on onto a waiting trailer truck.

{ 1 comment… read it below or add one }

Paul from St. Paul May 25, 2010 at 4:34 am

Was a bit foggy in Duluth today and tonight (Monday, May 24th)
To bad the live feed showing the bridge doesn’t have sound.
I’ll bet the fog horn on the south pier was going !

Leave a Comment