Biscayne Bay cuts a path

biscaynebay2007Dec12_2279
The Biscayne Bay‘s extended stay in Duluth was cut short when they were asked to go to Thunder Bay to break up their ice. The 140 foot Coast Guard cutter departed the port on Wednesday afternoon. Before departing, it refreshed the tracks made through the ice in the main shipping channels in the port. The tracks they opened up Wednesday meet under the Blatnik Bridge. One goes up the St. Louis River past Midwest Energy Resources and the CN dock. One goes down the Superior channel to the BN dock. And one moves up the inner harbor to the Lift Bridge. In the picture above, the ship is going down the Superior channel toward the Superior entry. You are looking back through a window on the bridge of the ship at the track the ship has just opened. The tracks often freeze over if there has not been a ship going through it for some time and/or it is very cold. The tracks through the ice in the main shipping channels can easily be seen from Skyline Drive. Photo taken on December 12, 2007
*submitted to the Duluth News Tribune for publication on 12-13-2007

Leave a Comment

*